Data Center News > Q3

—

August 2022

Data Center News

Boost Your Data Center Build Time

The global colocation data center market is expected to double to more than $62 billion from 2017 to 2022. This article discusses the latest solutions and strategies to boost the build time of new colocation centers. Here’s a look at ABB’s four most effective strategies to speed up data center builds by up to 50%.

Mega Project Mania

Mega Project Mania

Over the next few years, massive construction projects valued at more than $500 million in the industrial market may drive some epic electrical construction opportunities.

ReliaGear™ busway

ReliaGear™ busway

Save labor and extend product life

ReliaGear™ busway helps reduce labor and installation time by up to 50 percent by eliminating the time-consuming tasks of forming conduit and stripping, preparing, and pulling wire. An exclusive Blue Coat™ epoxy insulation provides the industry's longest insulation life of 50+ years, helps reduce risk of failure, and enables busway to perform across a wide temperature spectrum.

Data center resources
Eight Key Revisions

Eight Key Revisions

2021 NFPA 70E Standard

Contractors, whether performing installation or maintenance, must follow the NFPA 70E Standard for Electrical Safety in the Workplace. Here are eight recent changes to NFPA 70E that contractors must be aware of to comply with OSHA regulations and client requirements.

Key Requirements of NFPA 70E

Key Requirements of NFPA 70E

FAQ Document

Contractors follow the rules of the NFPA 70E Standard for Electrical Safety in the workplace to comply with OSHA regulations and client requirements. Implementing an electrical safety program based on NFPA 70E reduces contractor liability and creates a safer environment for employees. Randy Barnett, Certified Electrical Safety Compliance Professional, answers NFPA 70E key requirement questions in this document.

PowerTour Experience

PowerTour Experience

6 Reasons to Schedule a PowerTour

ABB’s high-power Customer Witness Test Center located in Richmond, Virginia, USA, is a state-of-the-art laboratory that visitors can witness test the complete operability of a UPS, STS or PDU with other critical power systems such as batteries, output distribution units, wireless data acquisition, and system controls.

Zenith T-series ATS
Zenith T-series ATS

Are you ready for the next generation of Automatic Transfer Switches? Welcome to the virtual launch event, where you will see the all-new ABB Zenith T-series ATS range for the first time. Our ABB subject matter experts will show you how Zenith T-series gives you more than any ATS. Helping you maximize uptime, simplify business operations, and plan a safe and sustainable future. The presentation will last 15 minutes, followed by a Q&A session.

 
Product Highlights
SACE® Emax 2
 
SACE® Emax 2

To guarantee power supply to critical loads, an installation must have a redundancy in supply sources. ABB’s All-In-One Innovation circuit breaker technology provides a simple yet sophisticated solution to multisource transfer schemes with Embedded ATS logic.

 
EPiC App
 
EPiC App

Improve the way you work, EPiC is your perfect digital partner: easy and smart product configuration, installation, commissioning, and assistance. A unique experience in one app for the low voltage electrical distribution.

 
Energy Efficiency Devices
 
Energy Efficiency Devices

B23 are precise UL energy meters for three-phase measuring. Both the B23 112-500 and B23 312-500 meters feature direct connections up to 65 A and are installed on DIN rail, which makes them suitable for a wide range of applications.

 

—

Events

2022 7X24 Fall Conference - Building for the Future

October 23-26, 2022
JW Marriott San Antonio Hill Country
San Antonio, TX

GET DETAILS
 

—

Get answers to your data center questions

Electrification Modify your profile Unsubscribe Privacy Policy © 2025 ABB